Before You Begin
You need Super Admin or Admin access to configure a performance cycle.
Step 8 follows Step 7: Auto-Scores. Complete Step 7 before continuing.
Expected Scores uses the rating labels you defined in Step 4: Rating Settings. Each label you created there appears as a distribution band in this step.
Step 8 is optional. If you do not need to enforce a score distribution, leave the toggle off and proceed to Step 9.
Bell Curve Expectations
The Bell Curve Expectations feature lets you define what percentage of participants you expect to fall into each rating label. This creates an expected distribution (a bell curve) that managers and calibration leads can reference when reviewing scores.
Toggle Apply Bell Curve Expectations ON to enable distribution targets for this cycle.
Group Tabs
When Bell Curve Expectations is enabled, distribution targets can be set at different group levels. Use the group tabs to switch between:
All participants: one distribution target for the entire cycle population.
Legal Entity: separate targets per legal entity.
Divisions: separate targets per division.
Departments: separate targets per department.
Roles: separate targets per role.
Job Role Levels: separate targets per job role level.
Select a tab to configure distribution targets for that grouping.
Setting Distribution Targets
Within each group tab, distribution sliders appear for each rating label from Step 4. Drag each slider or enter a percentage directly to set the expected percentage of participants for that rating level.
The total across all rating labels must equal 100%.
The Platform shows a running total so you can track how close you are to 100% as you adjust the sliders.
Set Forced Distribution Numbers
Turn on Set Forced Distribution Numbers to switch from percentage-based targets to absolute forced participant counts. When enabled, you define how many participants must fall into each rating label and allocate those numbers to Division Heads or managers.
This is useful when you want to manage the expected distribution using specific, mandatory headcounts instead of percentages.
Choose Who Receives the Numbers
Turn on Set Forced Distribution Numbers.
Select Set Numbers.
Under Select Scope, choose one of the following:
On Division Heads: Each Division Head receives distribution numbers for their division.
On Managers: Each manager receives distribution numbers for their own reporters.
Allocate Numbers to Division Heads
When you select On Division Heads, the Set Bell Curve Numbers window opens.
Review the summary at the top of the window, including All participants, Division Heads, Total Managers, and Total Participants.
Find each Division Head and review their number of Reports. Select the arrow beside a Division Head to expand the list and view their managers.
Under each rating label, enter the number of participants the Division Head should assign to that rating. The Target beside each rating label shows the expected total.
Review the Entity Target Summary at the bottom of the window. It shows how much has been allocated against each target, for example,
17/17.Click Save Allocations.
Select Reset Recommended to restore the recommended allocation, or Cancel to close the window without saving.
📝 Note: If some participants are not assigned to a Division Head within the selected scope, forced distribution numbers do not apply to them. The window shows how many participants are affected.
📝 Note: When the bell curve is applied at the Division Head level, managers can submit ratings without individual distribution limits. Make sure your performance cycle workflow includes a Calibration step. After the Review phase, Division Heads and cycle owners receive a warning when a group exceeds its configured distribution and requires adjustment.
Require Approval From Division Heads
After you allocate numbers to Division Heads, the Approval From Division Head toggle appears below Set Forced Distribution Numbers.
Turn on Approval From Division Head when Division Heads should review manager scores before they are approved.
When you turn it on, a Division Head Approval message appears. Select Ok to confirm, or Cancel to leave the option disabled.
With Approval From Division Head enabled:
Managers complete their reviews.
The scores are sent to the Division Head for review against the allocated distribution.
The Division Head can select Approve to validate the scores, or Reject to send them back to the manager for another evaluation. When scores are sent back, the manager can review their previous scores and comments.
Admins can still adjust the bell curve after reviews have started.
💡 Tip: Enable Approval From Division Head when using Division Head allocations, so Division Heads can actively review whether manager scores align with their allocated distribution.
⚠️ Warning: Employee scores remain in Draft until they are approved. If the performance cycle reaches its end date before approval is completed, the scores remain in Draft and can no longer be changed. Make sure Division Heads complete their approvals before the cycle end date.
Allocate Numbers to Managers
When you select On Managers, the Set Forced Numbers window opens.
Review Total Participants and Total Managers at the top of the window.
Find each manager and review their number of Reporters.
Under each rating label, enter how many of that manager's reporters should receive that rating. The Target beside each rating label shows the expected total across all managers.
⚠️ Warning: When you allocate numbers to managers, each manager’s allocation is a hard limit. A manager can’t give a rating to more reporters than the number allocated to them for that rating, so they must adjust their ratings to fit their allocation.
Next Step
After completing Step 8, click Next → to move to Step 9: Emails, where you can finalize the cycle and create it.
FAQ
Is Step 8 required to create a cycle?
Is Step 8 required to create a cycle?
No. Toggle Bell Curve Expectations off and click Next to proceed to Step 9 without setting any distribution targets. Expected Scores is optional.
What happens if actual scores do not match the expected distribution?
What happens if actual scores do not match the expected distribution?
The distribution targets are for reference and planning purposes. They appear on calibration and reporting views so managers can see how actual scores compare to expectations. The system does not automatically adjust scores to match the distribution.
Can I set different distributions for different departments?
Can I set different distributions for different departments?
Yes. Select the Departments tab and configure separate distribution targets for each department.
The total on my sliders is not reaching 100%. What should I do?
The total on my sliders is not reaching 100%. What should I do?
Adjust the sliders until the running total reaches exactly 100%. The system will not let you save distribution targets that do not total 100%.
What are rating labels in this context?
What are rating labels in this context?
The rating labels shown on the distribution sliders are exactly the labels you created in Step 4: Rating Settings (e.g., Needs Improvement, Below Expectation, Meet Expectation, Exceed Expectation, Top Performer). Each label becomes a distribution band.





